Providing and laying water proofing treatment on roofs of slabs by applying cement
slurry mixed with water proofing cement compound consisting of applying: a) after
surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with
water proofing cement compound @ 0.253 kg/ sqm. b) laying second layer of fibre
glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should
not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of
cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/
sqm and coarse sand @ 1.289 kg/ sqm. This will be allowed to air cure for 4 hours
followed by water curing for 48 hours. The entire treatment will be taken upto 30
cm on parapet wall and tucked into groove in parapet all around. d) fourth and
final layer of brick tiling with cement mortar (which will be paid for separately. For
the purpose of measurement the entire treated surface will be measured)
Providing and laying water proofing treatment on roofs of slabs by applying cement
slurry mixed with water proofing cement compound consisting of applying: a) after
surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with
water proofing cement compound @ 0.253 kg/ sqm. b) laying second layer of fibre
glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should
not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of
cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/
sqm and coarse sand @ 1.289 kg/ sqm. This will be allowed to air cure for 4 hours
followed by water curing for 48 hours. The entire treatment will be taken upto 30
cm on parapet wall and tucked into groove in parapet all around. d) fourth and
final layer of brick tiling with cement mortar (which will be paid for separately. For
the purpose of measurement the entire treated surface will be measured)